Net Energy Metering – Solar Rakyat · Estimate your savings before applying
Your Details
The maximum capacity limit for single phase is capped at 5 kWac.
RM
Estimated usage: – kWh
RM/kWh
Disclaimer:
For detailed proposals, kindly contact your Electrical Contractor Class PV (Grid Connected) for more consultation.
While ECoS strives to ensure the data is correct, no warranty expressed or implied is given as to the completeness,
accuracy or timeliness of the given data. The above data may be updated, changed or modified from time to time.
In no event shall ECoS be liable to any person for any special, indirect or consequential damages relating to this data.
Mode of Purchase: – |
Category: – |
Building Type: –
Your Current Monthly BillRM–Before solar installation
Monthly Bill with Solar RakyatRM–Net metered bill to Sabah Electricity
** Environmental impact is based on Sabah's 2024 emission factor (0.539 kg CO₂/kWh) and assumes 25-year PV system lifespan.
Disclaimer:
For detailed proposals, kindly contact your Electrical Contractor Class PV (Grid Connected) for more consultation.
While ECoS strives to ensure the data is correct, no warranty expressed or implied is given as to the completeness,
accuracy or timeliness of the given data. The above data may be updated, changed or modified from time to time.
In no event shall ECoS be liable to any person for any special, indirect or consequential damages, relating to this data.
** The environmental impact is with the assumption that Solar PV system lifespan is 25 years.